Plan de mejora enfocado en la seguridad industrial para la empresa Inmeplast basado en las 5S
Main Article Content
Abstract
The company Industrial Inmeplast was created on July 1st 1994, is located in the city of Cuenca-Ecuador, is dedicated to the manufacture of plastic parts and pieces in reduced times, through the use of injection machines. The problem with the research is that Inmeplast employees do not use the safety equipment constantly during their working day, causing accidents at work despite the fact that the company provides the necessary equipment (helmets, gloves, shoes, masks, goggles, earmuffs, work clothes) and even provides the appropriate training, talks or conferences to deal with the different emergencies that may arise. The objective of the study is to design an improvement plan in the production area of the company, implementing the 5S (They are the key tool to achieve the organization of the work area and each concept has an important function. Seiri: selection or classification, distinguishing what is necessary from what is not Seiton: Order or organization, a place for everything, and everything in its place. Seiso: Cleaning, establishing methods to keep the workplace clean. Seiketsu: Standardized cleaning, is the condition or state that exists when the first 3 " S"; are maintained. Shitsuke: Discipline, establish mechanisms to establish a habit). The research methodology is of a descriptive nature with a quantitative approach. The technique of surveys will be applied to obtain information that will serve as the basis for developing an improvement plan, which is a set of change measures taken in an organization with the aim of improving the production area with respect to the use of safety implements. Finally, the results will be workers committed to their safety by providing a comfortable working environment and thus become the ideal ally for the satisfaction of the organization.
Downloads
Metrics
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
References
Arguello, J., y Soto, A. (2014). Diseño e implementación del plan de mejoramiento de las condiciones de higiene y seguridad industrial en armalco s. a (fontibón siberia) (Tesis Tecnológica). Universidad distrital Francisco José de caldas, Bogotá, Colombia.
Benavides, K., Castro, P. (2010). Diseño e implementación de un programa de 5s en industrias metalmecánicas san judas Ltda. (Tesis de grado). Universidad de Cartagena, Cartagena, Colombia.
Cardona, G., y Serrano, L. (2012). Propuesta guía basada en la técnica de las 5s como herramienta básica para mejorar la productividad en la bodega de la unidad regional semap (Tesis de grado). Universidad del valle sede pacífico, Buenaventura, Colombia.
Cárdenas, L., Fecci., E. (2007). Propuesta de un modelo de gestión para PYMEs, centrado en la mejora continua. Síntesis Tecnológica, 3 (2), 59-67. Recuperado de: http://revistas.uach.cl/pdf/sintec/v3n2/art02.pdf
CMIC, V. (2012). La supervisión y la organización. Recuperado de http://www.cmicvictoria.org/wp-content/uploads/2012/06/La-supervision-y-control-en-la-Admnistracion.pdf
Francesc, P., Francesc, A., Esteve, A., Meritxell, C., Gimeno, S., Gomez, J… Vilardell, I. (2005). Marco general para el establecimiento, el seguimiento y la revisión de los planes de mejora. Agencia per a la Qualitat del sistema universitario de la Catalunya. Recuperado de: http://www.aqu.cat/doc/doc_40159984_1.pdf
Guachisaca, C., y Salazar M. (2009). Implementación de 5S como una metodología de mejora en una Empresa de Elaboración de Pinturas (tesis de posgrado). Escuela superior politécnica de litoral, Guayaquil, Ecuador.
Hernández, R., Fernández, C., y Baptista, L. (2014). Metodología de la investigación. México: McGRAW-HILL. Recuperado de: http://observatorio.epacartagena.gov.co/wp- content/uploads/2017/08/metodología-de-la-investigacion-sexta-edicion.compressed.pdf
Kaushik, P.; Khatak, N. y Kaloniya, J. (2015). Analyzing relevance and performance of 5S methodology: a review. International Journal of Advanced Research in Engineering and Applied Sciences, 4(4), 21-33. http://www.garph.co.uk/IJAREAS/Apr2015/3.pdf
Lagunas, J. (2007). Generalidades de las 5“S”. http://tesis.uson.mx/digital/tesis/docs/17812/Capitulo2.pdf
Manene, L., (2010). Las “9 S” y el plan de colaboración en el puesto de trabajo: pcpt. Recuperado de: http://www.luismiguelmanene.com/2010/11/22/las9-s-y-el-plan- de-colaboracion-en-el-puesto-de-trabajopcpt/
Martínez, C. (2013). La información en la disciplina administrativa. Revista e-Ciencias de la Información, 3 (2), 1-15. https://www.redalyc.org/pdf/4768/476848738004.pdf
Proaño, D., Gisbert, V., y Pérez, E. (2017). Metodología para elaborar un plan de mejora continua. 3C Empresa: investigación y pensamiento crítico, Edición Especial, 50-56. https://www.3ciencias.com/wp-content/uploads/2018/01/art_6.pdf
Rey, F. (2005). Las 5S. Orden y limpieza en el puesto de trabajo en España. Recuperado de https://books.google.com.ec/books?id=NJtWepnesqAC&printsec=frontcover&dq=inauth r:%22Francisco+Rey+Sacrist%C3%A1n%22&hl=es419&sa=X&ved=0ahUKEwip1Ouy5 bmAhUMWs0KHQ4gCPoQ6wEIMDAB#v=onepage&q&f=false
Rojas, M. (2015). Tipos de Investigación científica: Una simplificación de la complicada incoherente nomenclatura y clasificación. REDVET. Revista Electrónica de Veterinaria 16(1), 1-14. Recuperado de: https://www.redalyc.org/pdf/636/63638739004.pdf
Shaikh, S.; Alam, A.; Ahmed, K.; Ishtiyak, S. & Hasan, S. (2015). Review of 5S Technique.International Journal of Science, Engineering and Technology Research, 4(4), 927-931. Recuperado de: http://ijsetr.org/wp- content/uploads/2015/04/IJSETR-VOL-4-ISSUE-4-927-931.pdf
Sandoval, A., y Price M. (s.f.). Diseño de plan de mejora continua aplicando la metodología PHVA en la empresa de Emulsiones & Asfaltos SAC. https://www.usmp.edu.pe/PFII/pdf/20142_7.pdf
Santoyo, F., Murguía, D., López, A., y Santoyo, E. (2013). Comportamiento y organización. Implementación del sistema de gestión de la calidad de 5S´S. Diversitas: Perspectivas en Psicología, 9(2), 361-371. https://www.redalyc.org/pdf/679/67932397009.pdf
Universidad del Valle. (2006). Cartilla de Elementos de Protección Personal. Recuperado de: http://saludocupacional.univalle.edu.co/CartillaEpp. pdf
Venegas, Jenny (2010). Plan para la implementación de un sistema de seguridad y salud ocupacional en la empresa Embomachala S.A. (Tesis maestría). Universidad Politécnica Salesiana, Cuenca, Ecuador.
Vorkapić, M., Coćkalo, D., Dordević, D. y Besić, C. (2017). Implementation of 5s tools as a starting point in business process reengineering. Journal of Engineering Management and Competitiveness, 7(1), 44-54. https://scindeks-clanci.ceon.rs/data/pdf/2334-9638/2017/2334-96381701044V.pdf