Proposal for a mathematical model of labor performance in porcelain floors. Study case: Cuenca city
Main Article Content
Abstract
Introduction. The labor performance in the activity of porcelain tile floor tile installation is key for an efficient planning of construction projects. However, even today, the planning of this performance is not carried out in a technical way and linearity is assumed in the results, without considering the variability of this performance as a function of external and internal factors of the workers. Objective. To propose a mathematical model to predict the labor performance in the installation of porcelain tile floors in the city of Cuenca, specifically in the Machángara parish. Methodology. A review of the literature related to the factors that influence the performance of workers in this activity was carried out. Based on this information, an observation sheet was designed that included 6 variables and 35 relevant indicators. A descriptive methodology of a correlational type with a quantitative approach was applied, collecting data from a sample of 5 buildings in the porcelain tile installation phase. Results. The results, analyzed statistically, revealed an efficiency of 98% of the proposed model in relation to the actual performance of the workers. In addition, it was evidenced that, in Machángara, the workers' performance is below the theoretical standard provided by the GAD of Cuenca. Conclusion. It is concluded that the mathematical models based on the factors studied are capable of accurately predicting the performance of the workers, which can improve the predictions and execution times of the site managers.
Downloads
Article Details
References
Alves, C. L., Skorych, V., De Noni, A., Hotza, D., Gómez González, S. Y., Heinrich, S., y Dosta, M. (2023). Improving the sustainability of porcelain tile manufacture by flowsheet simulation. Ceramics International, 49(14, Part B), 24581-24597. https://doi.org/10.1016/j.ceramint.2023.01.056
Assaad, R., El-adaway, I., Hastak, M., y Needy, K. (2022). Key Factors Affecting Labor Productivity in Offsite Construction Projects. Journal of Construction Engineering and Management, 149, 04022158. https://doi.org/10.1061/JCEMD4.COENG-12654
Botero, L. F. B. (2021). Principios, herramientas e implementación de Lean Construction. Universidad EAFIT.
Díaz-Kovalenko, I. E., Larrea-Rosas, K. P., y Barros-Naranjo, J. (2022). El sector de la construcción en la economía ecuatoriana, importancia y perspectivas. Ciencias Sociales y Económicas, 6(2), Article 2. https://doi.org/10.18779/csye.v6i2.598
Fajardo Guapisaca, W. M., y Quizhpe Campoverde, J. D. (2021). Determinación de factores que afectan el rendimiento de la mano de obra en la actividad de colocación de cerámica en la ciudad de Cuenca. Dominio de las Ciencias, 7(Extra 4), 138. https://dialnet.unirioja.es/servlet/articulo?codigo=8383979
Guzmán, Á. (2012). ITIL v3—Gestión de Servicios de TI. Ecorfan Journal, 3(7), 801-806. https://dialnet.unirioja.es/servlet/articulo?codigo=4001967
Hamza, M., Shahid, S., Bin Hainin, M. R., y Nashwan, M. S. (2022). Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(3), 413-425. https://doi.org/10.1080/15623599.2019.1627503
Manoharan, K., Dissanayake, P., Pathirana, C., Deegahawature, D., y Silva, R. (2022). Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, ahead-of-print(ahead-of-print). https://doi.org/10.1108/CI-05-2022-0126
Momade, M. H., Shahid, S., Falah, G., Syamsunur, D., y Estrella, D. (2023). Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(4), 697-707. https://doi.org/10.1080/15623599.2021.1917285
Salgado Altamirano, J. R. (2016). Plan de negocios para la creación de una empresa dedicada al diseño, decoración y acabados de construcción en madera en la ciudad de Quito [bachelorThesis, Quito: Universidad de las Américas, 2016]. http://dspace.udla.edu.ec/handle/33000/5295
Santisteban Rimaycuna, D. M., y Silva Coronado, S. del R. (2022). Diseño de un sistema de gestión logística para las ventas en la empresa corporación Bim S.A.C., José Leonardo Ortiz 2018. Repositorio Institucional - USS. http://repositorio.uss.edu.pe//handle/20.500.12802/9319
Van Tam, N., Quoc Toan, N., Tuan Hai, D., y Le Dinh Quy, N. (2021). Critical factors affecting construction labor productivity: A comparison between perceptions of project managers and contractors. Cogent Business y Management, 8(1), 1863303. https://doi.org/10.1080/23311975.2020.1863303
Velástegui, A. M. Y., Franco, M. L. L., León, L. S., y Cumbicos, J. G. N. (2022). La contribución del sector de la construcción sobre el producto interno bruto PIB en Ecuador1. Revista Lasallista de Investigación, 15(2), 286-299. https://www.redalyc.org/journal/695/69559233023/html/