Methodological proposal for the management of road projects in the southern zone of Ecuador
Main Article Content
Abstract
This article addresses the problem of road project management because, the methodology, the lack of planning and the lack of management do not respond to the technical and economic point of view of the project, generating delays in the schedules and cost overruns. It is necessary to understand that the quality of communication routes of a territory is part of an important factor for the development of the country or region, and it is essential to improve the processes that allow their construction, because if the land routes are in good condition, they favor the population that benefits from the mobility of people, goods and services. For this research, the experimental method was used, through an interview with a structured questionnaire to obtain the results required for the formulation of the proposed methodology, which is expected to contribute effectively to the construction companies that adopt it. This was created based on international standards and methodologies management models that are applied worldwide, to correct in time, the inconveniences presented and avoid further delays that generate inconveniences to users and that, in the same way, produce cost overruns. It is also hoped that this study will serve as a guide for future projects, especially road projects and other civil works.
Downloads
Article Details
References
Barghi, B., & Shadrokh Sikari, S. (2020). Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Heliyon, 6(1), e03097. https://doi.org/10.1016/j.heliyon.2019.e03097
Benzadon, M. A., Duarte, J., & Hernández, M. (2012). Diseño e implementación de un sistema de gestión vial y de espacio público para Bogotá, Colombia. DOAJ: Directory of Open Access Journals - DOAJ.
Braglia, M., & Frosolini, M. (2014). An integrated approach to implement Project Management Information Systems within the Extended Enterprise. International Journal of Project Management, 32(1), 18-29. https://doi.org/10.1016/j.ijproman.2012.12.003
Castro Carrera, F. F., Castro Merino, E. P., Osorio López, J. C., & Merizalde Aguirre, J. E. (2022). Causas de retraso en la construcción de proyectos de agua potable y alcantarillado en Ecuador. Gaceta Técnica, 23(1), 3-19. https://doi.org/10.51372/gacetatecnica231.2
Daguerre, L., Capra, B., Albert, E. F., Larsen, D. O., Williams, E. A., Tidone, L., Faiella, P., Bolgeri, F., & Schvartzer, F. (2012). Sistema de Gestión Vial: aplicación en la ciudad de Mar del Plata. II Jornadas de Investigación y Transferencia de la Facultad de Ingeniería.
Doloi, H., Sawhney, A., Iyer, K., & Rentala, S. (2012). Analyzing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004
Elizondo-Salas, A. L. (2014). Conceptualización y evaluación de proyectos viales con inversión pública. Boletín Técnico.
García, L. R. M. (2016). Políticas públicas: motores propulsores para la gestión de proyectos viales dentro de organismos municipales | Revista Agunkuyâa. https://revia.areandina.edu.co/index.php/Cc/article/view/1970
Gil, A. C. (2009). Como Elaborar Proyectos de Pesquisa. Atlas eBooks. http://repositorioslatinoamericanos.uchile.cl/handle/2250/743562
Gunduz, M., & Almuajebh, M. (2020). Critical Success Factors for Sustainable Construction Project Management. Sustainability, 12(5), 1990. https://doi.org/10.3390/su12051990
Gündüz, M., Nielsen, Y., & Özdemir, M. (2013). Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering, 29(2), 133-139. https://doi.org/10.1061/(asce)me.1943-5479.0000129
Herrera, R. F., Sánchez, O., Castañeda, K., & Porras, H. (2020). Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis. Applied Sciences, 10(16), 5506. https://doi.org/10.3390/app10165506
Jiménez, J. C. (2012). Propuesta metodológica para la gestión integral de proyectos de construcción de edificaciones en Colombia. Repositorio UDEM.
Kivilä, J., Martinsuo, M., & Vuorinen, L. (2017). Sustainable project management through project control in infrastructure projects. International Journal of Project Management, 35(6), 1167-1183. https://doi.org/10.1016/j.ijproman.2017.02.009
Lozano Serna, S., Patiño Galindo, I., Gómez-Cabrera, A., & Torres, A. (2018). Identificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombia. Ingeniería y Ciencia, 14(27), 117-151. https://doi.org/10.17230/ingciencia.14.27.6
Macea-Mercado, L. F., Morales, L., & Márquez-Díaz, L. G. (2016). Un sistema de gestión de pavimentos basado en nuevas tecnologías para países en vía de desarrollo. Ingeniería, Investigación y Tecnología, 17(2), 223-236. https://doi.org/10.1016/j.riit.2016.06.007
Martínez Miranda, E., & Rodríguez Hernández, V. L. (2015). Opciones reales en la evaluación y manejo de riesgo en proyectos de inversión pública: caso México. Quipukamayoc, 22(42), 95. https://doi.org/10.15381/quipu.v22i42.11040
Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), 49-55. https://doi.org/10.1016/j.jare.2012.11.005
Monge, J. A. (2012). Componentes Esenciales de una Unidad Técnica de Gestión Vial en el Ámbito Municipal en Costa Rica. Infraestructura vial, 12(23), 18-23. https://dialnet.unirioja.es/descarga/articulo/5051920.pdf
Olatunji, A., & A. Diugwu, I. (2013). A Project Management Perspective to the Management of Federal Roads in Nigeria: A Case Study of Minna-Bida Road. Journal of Finance and Economics, 1(4), 54-61. https://doi.org/10.12691/jfe-1-4-1
Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526. https://doi.org/10.1080/01446191003674519
Oussouboure, G. (2017). La asignación de recursos en la Gestión de Proyectos orientada a la metodología BIM. Dialnet. https://dialnet.unirioja.es/servlet/articulo?codigo=6450734
Pradena, M. (2008). Gestión de Calidad en el Mantenimiento Vial Basada en el Principio de Enfoque al Cliente. Redalyc.org. https://www.redalyc.org/articulo.oa?id=127612584010
Risco, K. B., González, R. D. S., & Cuba, E. M. (2015). Visión sostenible en la conservación de carreteras: vial la farola. Ciencia en su PC, 4, 37-49. https://www.redalyc.org/pdf/1813/181351126003.pdf
Rojas, C. (2021, 19 junio). Plan de manejo de gobernanza ambiental para la reubicación de epifitas ante la ejecución de obras viales: vereda «El P´aramo», Pamplonita, Colombia | BISTUA Revista de la Facultad de Ciencias Básicas. https://ojs.unipamplona.edu.co/ojsviceinves/index.php/bistua/article/view/931
Rojas-Suárez, G. D., & Cuervo Galindo, C. A. (2021). Modelo de gestión de la maquinaria en proyectos viales basado en la filosofía lean management. Revista Boletín Redipe, 10(5), 273-294. https://doi.org/10.36260/rbr.v10i5.1303
Ruiz, A., & Guevara, J. (2020). Sustainable Decision-Making in Road Development: Analysis of Road Preservation Policies. Sustainability, 12(3), 872. https://doi.org/10.3390/su12030872
Sepasgozar, S. M. E., Karimi, R., Shirowzhan, S., Mojtahedi, M., Ebrahimzadeh, S., & McCarthy, D. (2019). Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK. Buildings, 9(9), 191. https://doi.org/10.3390/buildings9090191
Shehu, Z., Endut, I. R., & Akintoye, A. (2014). Factors contributing to project time and hence cost overrun in the Malaysian construction industry. Journal of Financial Management of Property and Construction, 19(1), 55-75. https://doi.org/10.1108/jfmpc-04-2013-0009
Silva-Balaguera, A., Leguizamón, O. D., & Valiente, L. L. (2018). Gestión de pavimentos basado en Sistemas de Información geográfica (SIG): una revisión. Ingeniería Solidaria, 14(26). https://doi.org/10.16925/in.v14i26.2417
Tarhini, A., Fakih, M., Arzoky, M., & Tarhini, T. (2015). Designing Guidelines to Discover Causes of Delays in Construction Projects: The Case of Lebanon. International Business Research, 8(6). https://doi.org/10.5539/ibr.v8n6p73
Unegbu, H., Yawas, D., & Dan-asabe, B. (2022). An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria. Journal of King Saud University - Engineering Sciences, 34(4), 240-249. https://doi.org/10.1016/j.jksues.2020.10.001
Veas, L., & Pradena, M. (2010). Aplicaciones de la administración integral de proyectos en la industria de la construcción: Segunda parte, proyectos viales. Revista de la construcción, 9(2), 89-96. https://doi.org/10.4067/s0718-915x2010000200009
Xu-Ye, L., López Ramírez, S., Allen Monge, J., & Loría Salazar, L. G. (2018). Desarrollo de la Gestión Vial Municipal en Costa Rica: Incidencia de Elementos Político – Técnicos. Revista Centroamericana de Administración Pública, 75. https://doi.org/10.35485/rcap75_9